When you are looking for highly requested NSN parts, aerospace parts, military and defense parts, and other similar items that trace back to leading manufacturers that you can trust, look no further than Military Supply Chain. We appreciate your interest in part number CK-104 LONG LEAD, a Crl Components Inc product we have in stock that is listed alongside the NSN 5910001135499 and the description “Capacitor Fixed Ceramic Dielectr.” If you would like to learn more about part number CK-104 LONG LEAD, be sure to fill out and submit the form provided on this page. Within 15 minutes or less, a member of our staff will contact you to present customized pricing and fulfillment options for your comparisons.
Note : We Will Not Share Your Information With Any Third Parties.
For your convenience, we list items like part number CK-104 LONG LEAD with all applicable designations. For instance, this item is listed alongside the NSN 5910-00-113-5499, and is categorized under Federal Supply Class (FSC) 5910 Capacitors. We also carry out testing, inspections, and document verification for much of our inventory, allowing us to guarantee fit, form, and function. With all of this in mind, begin the procurement process for Crl Components Inc part number CK-104 LONG LEAD from CAGE Code 71590 on our website, and see why so many customers routinely rely on Military Supply Chain for their needs.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-113-5499 Item PartTypeName: CAPACITOR,FIXED,CERAMIC DIELECTR | 5910 | 001135499 | 0 | P | A | |
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | A | 0 | |||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
300-100-610-104Z | 3 | 1 | C | A |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES TERMINAL(S) ON ONE SURFACE |
AARG | RELIABILITY INDICATOR | ESTABLISHED |
AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0.0010 |
ABJT | TERMINAL LENGTH | 1.250 INCHES MINIMUM |
ADAQ | BODY LENGTH | 0.290 INCHES NOMINAL |
ADAT | BODY WIDTH | 0.290 INCHES NOMINAL |
ADAU | BODY HEIGHT | 0.090 INCHES NOMINAL |
AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0.200 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
AGAV | END ITEM IDENTIFICATION | MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) |
CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000.0 MEGOHMS |
CQBQ | CAPACITANCE VALUE PER SECTION | 0.100 MICROFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -25.0 TO 15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100.0 DC SINGLE SECTION |
CRTP | TOLERANCE RANGE PER SECTION | -10.00 TO 10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000.0 MEGOHMS |
CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2.5000 |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED |
TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS,BROCHURES,ETC.,THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS,INDUSTRY DIRECTORIES,AND SIMILAR TRADE PUBLICATIONS,REFLECTI |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
ZZZK | SPECIFICATION/STANDARD DATA | 81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION |
If You’re Ever Looking for NSN parts Or Have an Aircraft On Ground Situation, Don’t forget That We offer Competitive Pricing and Guaranteed On-Time Delivery.
Request for Quote